Atc manual part 1




















Remove push-rod as shown on page 5. Consult AL-KO, see back page for details. Green Ready for journey LED not working If power ok, check push rod position: Red line visible - do not drive vehicle. Red line not visible - possible to continue journey but consult AL-KO see back page for details.

Please ensure that your vehicle towbar is correctly connected to ensure correct ATC operation. This can be checked with the use of a multimeter. Important - A 20 amp fuse is required for the constant 12V supply to Pin 4 on the 12S socket. If only a single fuse is fitted to supply both Pins 4 and Pin 6, the power supply capability of the installation must be checked and a minimum fuse rating of 25 Amps must be used. During the self test, the sound of the push rod moving inside ATC can be heard.

The table provided on page 4 details what to do in this case. Prior to commencing any journey, ensure that the caravan lighting is fully operational and check the vehicle is loaded appropriately, the nose weight and tyre pressures are correct, and confirm that the caravan is coupled to the vehicle with the breakaway cable correctly applied.

The power required to carry out this function is minimal. Explore Magazines. Editors' Picks All magazines. Explore Podcasts All podcasts. Difficulty Beginner Intermediate Advanced. Explore Documents. Uploaded by Nipuna Edirisinghe.

Did you find this document useful? Is this content inappropriate? Report this Document. Description: ATC techniques. Flag for inappropriate content. Download now. Related titles. Carousel Previous Carousel Next. Jump to Page. Search inside document.

Current radar coverage areas. So, how were you separating those? Vinoth Paramanantham. Remiller CCNA. Abdullah Attie. Amar Bhullar. Nguyen Quang Nam. Anuj Singh. Gurinder Randhawa. Ashish Bhad. ATC is committed to building a workforce that is as diverse as the communities we serve. Are you interested in consulting? Join us! Funded by the Applied Technology Council, the ATC Endowment Fund, and the Institute for Business and Home Safety, this page report provides guidelines and procedures for conducting postwindstorm and postflood building safety evaluations.

The purpose of these evaluations is to determine whether damaged or potentially damaged buildings are safe for use, or if entry should be restricted or prohibited. The ATC Field Manual is intended to be used by building officials, building inspectors, engineers, and others involved in postdisaster safety evaluation of building types commonly found in the United States.

The Field Manual explains three different building safety evaluation procedures. Two of the procedures Rapid Evaluation and Detailed Evaluation are discussed in detail. For each of these procedures, the document provides guidance on where to look for damage.

The Field Manual gives advice on evaluating structural, geotechnical, and nonstructural risks, and advice on how to rate the safety significance of certain types of damage. In addition, the Manual covers related topics of interest to safety personnel, including a how to deal with owners and occupants of damaged buildings; and b field safety issues.

Evaluation forms and posting placards, represented in the document in small-scale size, can be downloaded free of charge below. You need JavaScript enabled to view it. The following are available for immediate download in PDF format:. Dec 23, PST. Shipping help - opens a layer International Shipping - items may be subject to customs processing depending on the item's customs value. Your country's customs office can offer more details, or visit eBay's page on international trade.

Seller's other items. Sell one like this. Sponsored items from this seller. Showing Slide 1 of 2. Seller Similar sponsored items.



ninanodac1972's Ownd

0コメント

  • 1000 / 1000